Construction Home Loans
One closing or two — that’s the first construction-loan decision, and most retail lenders only offer one of the structures. A construction-to-permanent loan locks your mortgage at the initial closing and converts automatically at completion; a two-close build leaves the permanent mortgage open until the home is finished.
As a broker, REZILOANS shops the construction-active lenders in our 160+ lender network across conventional, FHA, VA, and USDA builds.
This is educational content and not financial advice. Loan programs and guidelines can change. Talk with one of our licensed mortgage professionals about your specific scenario.
A construction home loan finances a new build in stages called draws. The lender releases funds as work passes inspection, and you pay interest only on the disbursed balance during the build.
Two structures exist: construction-to-permanent (one closing, converting automatically to your mortgage at completion) and construction-only (two closings, with a separate permanent mortgage at the end).
Typical 2026 requirements:
- A lender-set down payment, typically above a standard purchase, and 680+ credit on the conventional path
- HUD’s minimum down payment with FHA single-close
- No down payment required for eligible veterans (VA construction) or eligible rural buyers (USDA single-close)
You’ll also need builder approval and a fixed budget with a 5–10% contingency reserve.
At REZILOANS, we shop the construction-active lenders in our 160+ lender network across all four programs.
REZILOANS publishes rates only at quote time. Your actual rate, APR, and terms depend on credit, equity, loan type, and program — we’ll shop all of it.
What Is a Construction Loan?
A construction home loan finances the build of a new home in stages called draws, rather than a single lump sum. The property doesn’t fully exist at the initial closing, so funds release as work reaches milestones: foundation, framing, mechanicals, finishes, final.
Each draw requires a lender-ordered inspection before money moves, and during the build you typically pay interest only on the balance disbursed so far instead of the full loan amount. CFPB’s home-buying resources cover the consumer protections that come with staged-disbursement financing.
The foundational decision is structure. A construction-to-permanent loan (one-time close) closes once and converts automatically into your mortgage at completion.
A construction-only loan is short-term: it pays off at completion through a separate permanent mortgage. That means a second closing, a second set of fees, and requalification at whatever the market looks like then.
Fannie Mae supports both structures on the conventional side, and its 2025 update expanded eligibility for the existing 18-month single-close credit-document window, making room for longer build timelines.
Construction Loan vs. Renovation Loan
A construction loan is not a renovation loan. If you’re buying an existing home and fixing it up, the right product is a rehab loan. Construction financing builds new, on a lot you already own or one rolled into the closing.
Program reach is wider than most builders let on. It spans conventional single-close, FHA single-close at HUD’s minimum down payment, VA construction with no down payment required for eligible veterans, and USDA single-close in rural-designated areas.
Owner-builder projects (acting as your own general contractor) are the exception: most lenders decline them. The small pool that funds them layers on higher down payments, lower LTV (loan-to-value) caps, and documented construction experience.
As a broker, REZILOANS shops your build across the construction-active lenders in our 160+ lender network, with both structures and all four programs compared.
Who Qualifies for a Construction Loan?
Construction underwriting qualifies two things at once: you (the standard credit, income, and debt profile, judged at the permanent-mortgage stage) and the build itself (builder, budget, lot, and timeline).
Construction Loan Requirements
Both have to clear:
- ✓Credit score. Conventional one-time close runs 680–700+ typical at most construction-active lenders, with the best pricing above 720. FHA single-close reaches down to 580+. VA sets no minimum of its own (lender overlays typically 620+), and USDA lenders run 640+ typical.
- ✓Down payment & land equity. Conventional: typically a larger down payment than a standard purchase. Some lenders go lower, and Fannie Mae’s single-close program permits up to 95% LTV with automated approval, though few construction lenders price there. FHA single-close: HUD’s minimum down payment (see our FHA home loan page for MIP mechanics). VA and USDA: none required for eligible borrowers (VA home loan page · USDA loan page). Already own the lot? Its equity usually counts toward the requirement.
- ✓Debt-to-income (DTI). Standard program rules apply at the permanent-qualifying stage: conventional around 45%, FHA up to 50% with compensating factors, VA residual-income math, USDA standard.
- ✓Income documentation. Full doc only — two years of tax returns or W-2 history, pay stubs, bank statements. Construction isn’t a non-QM space: no bank-statement or DSCR documentation paths.
- ✓Builder approval. Mandatory at most lenders: licensed, insured, financial-strength review, build history. Some keep approved-builder lists; others approve case by case. The builder can sink a deal the borrower would otherwise clear.
- ✓Owner-builder eligibility. Most lenders won’t fund owner-builder projects (you acting as your own general contractor). The small pool that does fund them layers on higher down payments, lower LTV caps, extra reserves, and documented construction expertise.
- ✓Budget, contingency & reserves. Lenders want a fixed construction contract before locking the loan, a 5–10% contingency reserve held in escrow for overruns, and typically 3–6 months of reserves at the permanent stage.
Four Program Paths to a New Build
Program choice usually settles itself on down payment and eligibility. All four run the same draw-and-inspection mechanics. The difference is who qualifies and what rides on the permanent mortgage:
| Path | Min down | Min credit | What to know |
|---|---|---|---|
| Conventional one-time close | Lender-set; typically above a standard purchase | 680–700+ | Broadest construction pool; no mortgage insurance premium |
| FHA single-close | Set by HUD | 580+ | Lowest-down non-VA path; MIP rides the permanent loan |
| VA construction | None required | Lender overlays (no VA minimum) | Eligible veterans; carried by very few lenders |
| USDA single-close | None required | 640+ typical | Rural-designated areas; income caps apply |
Two scenarios worth knowing about before you commit. Buyers who want a finished home on a mover’s timeline — not a 6–12 month build — have faster options. Existing inventory or new construction from a builder often serves them better.
And investor builds (spec homes, build-to-rent) run through a separate specialty pool with different appetite. See our investment property loans page, and note that build-to-rent investors often pair construction financing with DSCR (debt service coverage ratio) refinancing at completion.
Not sure a ground-up build is the right entry point? For the broader low-down-payment landscape, see our low down payment options page and the first-time home buyer page.
Construction Loan Benefits
Lock the Permanent Rate Before the First Shovel
A one-time close sets your mortgage terms at the initial closing and converts automatically at completion. No requalification, no exposure to whatever the market does during a 6–12 month build. Per Fannie Mae’s program rules, if pricing improves during construction, the rate can be updated at conversion.
One Set of Closing Costs
A two-close build pays for two closings: the construction loan and the permanent mortgage, each with its own fees. Single-close pays once. On most loans, that duplicate-fee delta is the biggest structural saving on the table.
Interest-Only on the Disbursed Balance
During the build you pay interest only on what has actually been drawn rather than the full loan amount. Early-month interest is calculated on the foundation draw, not the finished-house number. That keeps construction-phase payments manageable while you’re still housed elsewhere.
Four Programs, Not Just One
Most construction lenders carry conventional one-time close and stop there. The construction-active pool in our 160+ lender network also reaches FHA single-close at HUD’s minimum down payment, VA construction with no down payment required for eligible veterans, and USDA single-close in rural-designated areas.
Land Equity Counts
Already own the lot? Most construction-active lenders credit land equity toward the down-payment requirement. A lot owned free and clear can sometimes cover the entire equity contribution on a conventional build. Lender treatment varies, which is one more thing we shop.
Draws Keep the Build Accountable
Funds release only as work passes lender-ordered inspections, milestone by milestone. That protects you as much as the lender: your builder gets paid for completed work, not promises, and the draw schedule keeps the project’s cash flow disciplined.
Construction Loan Costs & Alternatives
Three buckets make up the all-in cost of a construction loan:
- The equity contribution (down payment or land equity)
- The construction-phase layer (interest-only on draws, inspections, contingency reserve)
- Standard closing costs, paid once on a single-close, twice on a two-close
The rate is separate. REZILOANS publishes rates only at quote time, because construction pricing depends on program, structure, builder strength, credit, and the specific construction-active lender that prices your application that week.
Sources: Fannie Mae construction products · CFPB owning-a-home resources
| Feature | Construction-to-Permanent (One-Time Close) | Construction-Only (Two-Close) |
|---|---|---|
| Closings | One: construction and mortgage close together | Two: construction loan now, separate mortgage at completion |
| Closing costs | One set | Two sets: duplicate fees at the second close |
| Rate lock | Permanent rate locked at initial closing; some programs update down at conversion | Permanent rate set at the second closing — market risk during the build |
| Requalification at completion | None: conversion is automatic | Required: credit pull, income re-verification, appraisal of the completed home |
| Construction phase | 6–12 months typical; some lenders extend to 18 for complex builds | 6–12 months typical |
| Flexibility during the build | Lower: terms locked up front | Higher: shop the permanent mortgage at completion with current market data |
| Programs available | Conventional, FHA, VA, and USDA single-close variants | Conventional construction-only, then any permanent program |
| Best fit for | Most buyers: rate certainty plus one set of fees | Borrowers expecting credit or income improvement mid-build, or builder-paired construction financing |
Comparison reflects Fannie Mae single-closing and two-closing construction-to-permanent program structures (including the 2025 expansion of eligibility for the existing 18-month single-close credit-document window, per SEL-2025-09). It also reflects the FHA / VA / USDA single-close variants per their program pages, and typical construction-active lender practice. Lender overlays and structures vary.
Construction Loan Cost Breakdown
- Down payment & land equity: typically larger than a standard purchase on conventional one-time close (Fannie Mae’s single-close program permits up to 95% LTV with automated approval, though few construction lenders price there). It’s HUD’s minimum down payment on FHA single-close, and none on VA and USDA for eligible buyers. Lot equity credits toward the requirement at most lenders.
- Construction-phase interest: interest-only, calculated on the disbursed balance. If roughly a third of the loan has been drawn by month four, that month’s interest runs on just that third. The interest-only period ends at conversion (single-close) or at the permanent closing (two-close).
- Closing costs: typically 3–5% of the permanent loan amount. A two-close structure pays a second set at the permanent closing — the duplicate-fee point that usually decides the structure question.
- Draw schedule & inspections: typically 4–6 stages: foundation, framing and weather-in, mechanicals, drywall and finishes, final and certificate of occupancy. A lender-ordered inspection precedes each release, and draw mechanics vary by lender — which affects your builder’s cash flow and belongs in the lender-selection conversation.
- Contingency reserve: 5–10% of the build cost held in escrow to absorb overruns: material price moves, subcontractor change orders, scope adjustments. Unused contingency typically reduces principal or funds approved additions at completion.
- Mortgage insurance & loan limits: conventional PMI (private mortgage insurance) applies if the permanent loan exceeds 80% LTV (cancellable per standard rules). FHA single-close carries standard MIP on the permanent mortgage. The 2026 conforming limits — $832,750 baseline, $1,249,125 high-cost (one-unit) — decide whether your permanent mortgage lands in jumbo loan territory.
2026 Loan Limits: When a Build Goes Jumbo
Conforming, one-unit: $832,750 baseline / $1,249,125 high-cost ceiling. Source: Fannie Mae loan limits. Many custom builds price above the baseline. When the permanent mortgage will exceed conforming, we pre-route the scenario to construction-active lenders comfortable with both the build phase and the jumbo conversion. See our jumbo home loan page for that underwriting landscape.
Run Your Numbers Before You Commit
- ?How much house can I afford?
- ?What will my monthly payment be?
- ?Should I rent or buy?
- ?How much could I save with a refinance?
- ?What does a buydown do to my rate?
6 Calculators. One Tool. No Login.
How REZILOANS Makes Construction Loans Different
Most construction-loan pages run through the phases and stop. The useful part is knowing which lenders actually write single-close construction — and where building isn’t the right path for your plans.
Straight Answers at Every Step
A construction loan stays open for months while your home is built, long after most loans would have closed. Your loan officer explains each phase before you sign, from the build budget to the final inspection, and stays your point of contact throughout.
Construction-Active Lenders, Actually Compared
Most retail lenders don’t do construction at all; the ones that do differ on everything that matters:
- One-time-close availability
- Approved-builder lists
- Draw schedules
- Construction-phase terms
- Contingency requirements
- Owner-builder appetite
- How long a rate lock survives a slow build
Same build, very different terms. One application, one credit pull, the construction-active lenders in our 160+ network compared.
One-Time Close vs. Two-Close, Run Both Ways
The builder’s preferred lender shows you one structure. We run both — the duplicate-fee savings of a single close against the flexibility of shopping the permanent mortgage at completion. We also run the four-program comparison (conventional, FHA, VA, USDA) on your build. Sometimes the builder’s in-house financing wins; we’ll tell you when it does.
And when a construction loan isn’t right for you, we route you to the product that fits.
If you’re renovating an existing home rather than building new, the right product is a rehab loan — see our guide to purchase-plus-renovation financing. If you want a finished home on a mover’s timeline, existing inventory or builder stock usually fits better. And investor spec builds route through the investment-property specialty pool, not consumer construction.
How to Get a Construction Loan With REZILOANS
Here’s how we get you to the finish line.
Request a Quote
Share some basics. We follow up personally.
We Shop Your Loan
We have access to 160+ lenders to try and find the right program for you.
Apply & Lock Your Rate
Submit your application and lock in your rate.
Processing & Clear to Close
We handle the details and keep you updated along the way.
Close & Fund
Sign the docs and construction begins. Your loan is funded.
1Request a Quote
Share some basics. We follow up personally.
2We Shop Your Loan
We have access to 160+ lenders to try and find the right program for you.
3Apply & Lock Your Rate
Submit your application and lock in your rate.
4Processing & Clear to Close
We handle the details and keep you updated along the way.
5Close & Fund
Sign the docs and construction begins. Your loan is funded.
